Wellcome

Flexible budgetary control and standard costs; cost control for management.

By: Evans-Hemming, D. FMaterial type: TextTextPublication details: London : Macdonald & Evans, 1952Description: 184 p. illus. 26 cmSubject(s): Budget in business | Cost accountingDDC classification: 658.1
Item type:
Tags from this library: No tags from this library for this title. Log in to add tags.

No. of hits (from 9th Mar 12) :

Powered by Koha